Skip to content

Reconcile On-Prem Monthly Metering and Details ​

Target Outcome ​

Map tenant credits, monthly usage, and metering details to actual instances or workloads for the same tenant and billing cycle.

Applicable Roles ​

  • Platform Operator
  • Model Provider and End User reviewing their own resource consumption

Before You Start ​

  • Identify the target tenant, billing cycle, instance or workload ID, and metering unit.
  • Confirm that monitoring and metering collection is reporting and start and end times are traceable.

Steps ​

  1. Open the quota, credit, or usage governance page provided by the current UI, and review opening, allocated, used, and remaining amounts where available.

  2. Open Monthly Usage, select the same tenant and billing cycle, and review resource type, specification, and summarized usage.

Review monthly usage by tenant and billing cycle

  1. Open Metering Details and trace totals by instance, workload, and time range.

Trace summarized usage to metering details

  1. Compare runtime and specification in device, node, and workload monitoring. Confirm that end time, card count, and metering unit agree.

  2. When an offline reconciliation is required, use Detail Download from the same filter scope. Keep the exported file under access control and record the selected tenant, region or availability zone, resource type, and time range with the evidence.

Completion Checklist ​

Purpose: These checks explain why credits changed and which workloads form the monthly total. Do not stop after viewing only a summary number.

CheckPass Criteria
Credit changesOpening, allocation, deductions, and remaining credits can be explained.
Monthly totalTenant, cycle, resource type, and metering unit are consistent.
Detail traceSummarized usage maps to instances or workloads and time ranges.
Monitoring matchCard count, runtime, and end time agree with monitoring records.

Troubleshooting ​

SymptomCheck First
Monthly usage differs from detail totalsBilling-cycle boundary, time zone, aggregation delay, and metering unit
Usage continues after the instance stopsWorkload end time, residual instance, and state synchronization
Credits remain but workload creation failsTenant quota, specification capacity, template, and free cluster resources
Detail download does not match the pageReapply the same tenant, region/zone, resource-type, billing-period, time-zone, and pagination filters before comparing totals